{"id":3639,"date":"2026-11-10T12:34:00","date_gmt":"2026-11-10T04:34:00","guid":{"rendered":"http:\/\/www.senabodeeschool.com\/blog\/?p=3639"},"modified":"2026-11-10T12:34:00","modified_gmt":"2026-11-10T04:34:00","slug":"what-are-the-limitations-of-other-panel-4bf7-802f28","status":"publish","type":"post","link":"http:\/\/www.senabodeeschool.com\/blog\/2026\/11\/10\/what-are-the-limitations-of-other-panel-4bf7-802f28\/","title":{"rendered":"What are the limitations of Other Panel?"},"content":{"rendered":"<p>If you\u2019ve worked in the display component industry for long enough, you\u2019ve probably heard the term \u201cOther Panel\u201d thrown around. For those of us on the supply side, it\u2019s a label that\u2019s become as common as it is ambiguous, often used to describe any display panel that doesn\u2019t fall under the well-known categories like LCD, OLED, AMOLED, or mini-LED. As a supplier who\u2019s built my business around custom Other Panel solutions for industrial equipment, medical devices, and niche consumer electronics over the past 12 years, I\u2019ve seen this shorthand save time in procurement meetings and stall projects before they even start. Today, I want to pull back the curtain on the real limitations of Other Panels\u2014limitations you won\u2019t see listed in generic spec sheets, and that I\u2019ve learned to navigate (and work around) for clients who need more than a one-size-fits-all display. <a href=\"https:\/\/www.honeycomb-js.com\/other-panel\/\">Other Panel<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.honeycomb-js.com\/uploads\/45373\/small\/aluminium-sandwich-panel44b3c.jpg\"><\/p>\n<p>First, let\u2019s ground this in what \u201cOther Panel\u201d actually means in the wild. It\u2019s a catch-all term, invented by procurement teams to group panels from smaller, less dominant manufacturers that don\u2019t have the brand recognition of Samsung, LG, or BOE. For many of these suppliers, \u201cOther\u201d isn\u2019t just a category\u2014it\u2019s their entire product line: low-volume, application-specific panels that major manufacturers don\u2019t prioritize. That lack of standardized design and manufacturing infrastructure is the root of most of the limitations I\u2019ve watched clients struggle with over the years.<\/p>\n<p>One of the most impactful limitations is poor supply chain consistency, a problem that stems directly from the scale of most Other Panel producers. Large display makers run multi-billion-dollar fabs that produce millions of panels a month, with tiered raw material contracts that lock in glass substrates, backlight components, and driver ICs for years. For an Other Panel supplier, by contrast, raw materials are often sourced from multiple small distributors, with no long-term agreements. Last year, a medical device client I work with had to halt production for six weeks when their main Other Panel manufacturer\u2019s supplier of custom touch sensor film ran into a quality issue. The manufacturer couldn\u2019t switch to an alternative film without re-testing every panel, and had no safety stock to pull from. Large panel makers like BOE would have had a backup film supplier qualified and on standby, or could adjust their production line to prioritize small orders without waiting for material re-qualification. For clients building medical devices, where production delays can mean missing regulatory deadlines and losing market windows, this inconsistency isn\u2019t an inconvenience\u2014it\u2019s a financial risk. I\u2019ve also seen retail clients with custom kiosk displays face a similar issue: when their 50,000-unit order of Other Panels arrived, 8% had slight color variance that made the kiosk displays look mismatched when installed in high-traffic areas. The manufacturer couldn\u2019t rework the panels without shutting down their line for weeks, so the client had to absorb the cost of replacing units or selling the kiosks at a steep discount.<\/p>\n<p>Next, consider the lack of standardized testing and certification. Large panel manufacturers invest heavily in third-party testing for their products, with certifications like IP ratings for water resistance, ISO 13485 for medical devices, or UL safety ratings for consumer electronics built into every production run. Other Panel suppliers, by contrast, often operate on lower overhead, so certification is either an afterthought or a one-time check that isn\u2019t replicated for every production batch. I had a client in the agricultural sector come to me two years ago with a custom weather monitoring system. Their original Other Panel supplier had quoted a panel with an IP65 rating, which was required for outdoor use. When the client deployed 2,000 units, 12% of the panels developed water damage within six months of installation. When they went back to the supplier, it turned out the IP65 rating was a single test result from a sample panel, not a requirement for every production unit. The manufacturer refused to absorb the cost of replacement, citing \u201cvariation in production tolerances\u201d that their testing process didn\u2019t catch. For clients in aerospace or automotive\u2014industries where display reliability can impact safety\u2014this lack of consistent certification isn\u2019t a minor flaw; it\u2019s a compliance risk. Even when an Other Panel supplier offers to get a certification, it often adds 2\u20133 weeks to lead times, and comes with no guarantee that every panel will pass the test. That\u2019s a stark difference from major manufacturers, where every panel is tested for compliance before it leaves the factory floor, with audit trails that can be traced back to individual production runs.<\/p>\n<p>Another often-overlooked limitation is limited customization support, especially for low-volume orders. This is ironic, because many clients turn to Other Panels precisely because they need a display that\u2019s tailored to a specific application. But the small teams at most Other Panel suppliers can\u2019t dedicate the engineering time to adapt panels to unique needs. A few months ago, a startup making portable diagnostic devices approached me looking for a 7-inch panel with a slightly curved edge to fit the tight casing of their device. They only needed 500 units for their first production run, a volume that most large panel makers wouldn\u2019t even quote, and a volume that many Other Panel suppliers treat as a hassle. When they reached out to three different Other Panel manufacturers, two quoted 12-week lead times and a 20% surcharge for the custom edge, and the third refused the order entirely, saying it would \u201cdisrupt their standard production line.\u201d We were able to solve it in our facility, where we work with a network of small manufacturers that specialize in low-volume custom displays, but only after we spent 6 weeks on engineering adjustments that would have been covered by a major panel maker for a 10,000-unit order. This isn\u2019t a one-off issue. Many Other Panel suppliers use the same off-the-shelf design for all their panels, only changing the size of the glass substrate to cut costs. So if you need a panel with a unique aspect ratio, or integrated features like a built-in speaker or a sunlight-readable layer, you\u2019re often limited to pre-approved options that the supplier already has in stock. For clients building niche products\u2014like rugged handheld tools or wearable medical devices\u2014this lack of customization can mean sacrificing performance to fit an off-the-shelf panel, or abandoning an entire product line because the right display doesn\u2019t exist at a price they can afford.<\/p>\n<p>Cost volatility is another major limitation, one that often catches new clients off guard. Large panel manufacturers have the scale to absorb fluctuations in raw material costs, so their panel prices stay consistent for 6\u201312 month periods, with minimal changes even when global supply chains are disrupted. Other Panel suppliers, by contrast, operate with thinner margins, and often pass on 10\u201315% price increases within a month of any raw material or component cost change. Last year, during the global semiconductor shortage, a client in the industrial automation sector had a 10,000-unit order for Other Panels that they\u2019d quoted at $45 per unit. A month before delivery, the supplier told them the driver ICs they used had increased in cost by 30%, so the new price would be $52 per unit, with a 2-week delay if they didn\u2019t accept the increase. The client was locked into a production schedule that required the panels, so they had to pay the extra $70,000\u2014money they hadn\u2019t budgeted for. Large panel makers, even during the same shortage, were able to keep their prices stable for contracted orders, because they had long-term contracts with IC manufacturers that prioritized their orders. This volatility isn\u2019t just a short-term issue, either. Many Other Panel suppliers will quote a price for an order, then raise it later by claiming \u201cdemand for components\u201d without providing any documentation, because they know clients are often willing to pay more to avoid project delays.<\/p>\n<p>Finally, there\u2019s the long-term support and obsolescence risk, which is often the most costly limitation of all. Major display manufacturers keep production lines running for 5\u201310 years for popular panel models, with spare parts and technical support available for decades. Other Panel suppliers, especially small ones, can go out of business, pivot to a different product line, or discontinue a panel model after just 1\u20132 years, leaving clients stuck with products they can\u2019t repair or upgrade. I had a client in the point-of-sale (POS) industry come to me three years ago with a problem: they had deployed 5,000 self-checkout kiosks in grocery stores, using Other Panels from a small supplier that had gone under six months prior. Now, the panels were developing backlight failures, and the client couldn\u2019t get replacement parts or technical support to fix them. The supplier had never kept a stock of spare backlight modules, and no other manufacturer made a compatible module for the discontinued panel. As a result, the client had to replace 300 faulty panels at a cost of $150,000, and they\u2019re now facing a potential recall of 1,000 more panels that are showing early signs of failure. For products like POS kiosks, industrial control systems, or medical devices that are expected to last 7\u201310 years, this short product lifecycle is a critical flaw. Large panel models, by contrast, are designed for long production runs, with documented spare parts and support that\u2019s available for years after the initial order.<\/p>\n<p>Now, I\u2019m not here to bash Other Panels entirely\u2014for many clients, they\u2019re the only viable option. If you need a low-volume, custom panel for a one-off project, or if your application doesn\u2019t require the strict quality and consistency of a major manufacturer\u2019s product, Other Panels can be a cost-effective solution. But to avoid the pitfalls I\u2019ve outlined, you need to go into any Other Panel order with your eyes open. That means asking for proof of consistent certification for past production runs, requiring the supplier to provide a backup raw material source, and negotiating long-term pricing contracts to avoid volatility. It also means working with a supplier that has experience navigating these limitations, because even with the challenges, Other Panels can deliver value when you know how to manage their risks.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.honeycomb-js.com\/uploads\/45373\/small\/carbon-crystal-board6d39a.jpg\"><\/p>\n<p>At the end of the day, the best display solution depends on your project\u2019s specific needs: volume, timeline, regulatory requirements, and long-term support. If you\u2019re considering an Other Panel for your next project and want to walk through the tradeoffs, or if you\u2019re looking for a partner to help you navigate the limitations while getting the custom display you need, reach out to our team. We work closely with Other Panel manufacturers to secure consistent supply, validate certifications for every production batch, and offer the low-volume customization that major suppliers often refuse. Don\u2019t let the limitations of generic Other Panels derail your project\u2014let\u2019s talk through your requirements and find a display solution that balances cost, performance, and reliability.<\/p>\n<p><a href=\"https:\/\/www.honeycomb-js.com\/honeycomb-core\/polypropylene-honeycomb-core\/\">Polypropylene Honeycomb Core<\/a> References:<\/p>\n<ol>\n<li>Display Supply Chain Consultants. Global Display Panel Market Report, 2023.<\/li>\n<li>International Organization for Standardization. ISO 13485:2016, Medical Devices &#8211; Quality Management Systems.<\/li>\n<li>Underwriters Laboratories. UL 60950-1:2019, Safety of Information Technology Equipment.<\/li>\n<li>Agricultural Technology Association. Outdoor Display Performance and Compliance Standards, 2022.<\/li>\n<\/ol>\n<hr>\n<p><a href=\"https:\/\/www.honeycomb-js.com\/\">Zhejiang Jusen Building Materials Technology Co., Ltd.<\/a><br \/>We&#8217;re well-known as one of the leading panel manufacturers and suppliers in China, also support custom service. Please feel free to wholesale high quality panel made in China here from our factory. For more information, contact us now.<br \/>Address: No.7, Tongyuan Shiquan Industrial Park, Haiyan County, Jiaxing City, Zhejiang Province<br \/>E-mail: sales@jusenzj.com<br \/>WebSite: <a href=\"https:\/\/www.honeycomb-js.com\/\">https:\/\/www.honeycomb-js.com\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you\u2019ve worked in the display component industry for long enough, you\u2019ve probably heard the term &hellip; <a title=\"What are the limitations of Other Panel?\" class=\"hm-read-more\" href=\"http:\/\/www.senabodeeschool.com\/blog\/2026\/11\/10\/what-are-the-limitations-of-other-panel-4bf7-802f28\/\"><span class=\"screen-reader-text\">What are the limitations of Other Panel?<\/span>Read more<\/a><\/p>\n","protected":false},"author":102,"featured_media":3639,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[3602],"class_list":["post-3639","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","tag-other-panel-40fe-80711e"],"_links":{"self":[{"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/posts\/3639","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/comments?post=3639"}],"version-history":[{"count":0,"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/posts\/3639\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/posts\/3639"}],"wp:attachment":[{"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/media?parent=3639"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/categories?post=3639"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.senabodeeschool.com\/blog\/wp-json\/wp\/v2\/tags?post=3639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}